- Breaking ground!
- Digging down.
- Cranes.
- Pouring concrete.
- Drilling.
- Framing is started
- Cranes are working hard
- Framing
- Framing of the school is underway
- New walls being installed outside of gymnasium
- New walls being built.
- Roof beams being carried to the crane for installation.
- Roof beams for gymnasium being installed by crane.
- Front of school
- Front/west side of school
- West side of school Feb 2016
- Lifting the modular units into place
- Lifting the modular units into place
- Lifting the modular units into place
- Lifting the modular units into place
- Preparing to move the modular units into place on the East side as well